夸克影院免费观看电视剧_暴躁老女人免费观看电视剧的软件_妹妹喜欢大棒棒免费观看电视剧_美国免费观看60分钟电视剧大全_驯服小姑子免费观看完整版电视剧_二人世界高清免费观看完整中文_西瓜视频免费观看最新电视剧大全_樱花影院电视剧电影免费观看_暴躁大妈2免费观看全集高清_精品熟女少妇AV免费观看

Welcome to [ Jiangsu omg plate heat exchanger manufactur Co., Ltd. ] website!
Product
Ultra high pressure oil cylinder

Position:Home > Ultra high pressure oil cylinder >

The use and maintenance of ultra-high pressure oil cylinders
1、 Basic requirements
1. The recommended working fluid is: YA-N46 for summer, YA-N32 hydraulic oil for winter, or mechanical oil of corresponding viscosity (at 50 ° C, the kinematic viscosity is 30 to 40 centimeters).
2. During operation, the oil temperature should be between 5 ° C and 65 ° C to avoid accelerated aging of the seals.
3. It should be ensured that the hydraulic oil is clean, and the oil contamination index should be at level 19/16 of the Chinese standard.
2、 Packaging, Storage, and Transportation
1. During the storage and transportation of hydraulic cylinders, corresponding packaging should be added, and protective devices should be installed on the oil port joint surface and the exposed part of the piston rod.
2. During storage and transportation, it should be securely fixed to prevent collision.
3. When lifting, it should be securely fastened to prevent dropping and collision.
3、 Disassembly and assembly of the ultra-high pressure oil cylinder
1. Before disassembling the hydraulic cylinder, the oil pressure in the hydraulic cylinder circuit should be reduced to zero.
2. When disassembling, be careful not to damage the parts of the hydraulic cylinder.
3. Due to the different specific structures of hydraulic cylinders and the different disassembly sequences, it is necessary to make judgments based on the specific situation.
1) For flange connection type, the flange connection screws should be removed first, and the end cover should be pushed out with screws. It is not allowed to pry or hammer hard to avoid damage.
2) For the internal key type connection, a special tool should be used to push the guide sleeve inward, expose the key, remove the key, and fill the key slot with a nylon or rubber material before removing it externally.
3) The threaded connection type oil cylinder should first unscrew the threaded cover.
4) When dismantling the piston rod and piston, the piston rod assembly cannot be forcefully pulled out of the cylinder. Efforts should be made to keep the axis of the piston rod assembly and the cylinder on the same line and slowly pull it out.
4. After dismantling and inspecting the parts, they should be stored in a relatively clean environment and equipped with isolation devices to prevent collisions. Before reassembly, the parts should be cleaned thoroughly.
4、 Requirements for work environment
1. In windy and rainy environments, the exterior of hydraulic cylinders should be treated with rust prevention.
2. When working in high temperature environments, insulation devices should be installed around the hydraulic cylinder.
3. In dusty working environments, dust prevention facilities should be installed outside the hydraulic cylinder.

Copy right of the 2017 Jiangsu omg plate heat exchanger manufactur Co., Ltd. All Rights Reserved

備案號:蘇ICP備17022451號 蘇公網(wǎng)安備32028102001776